Poured concrete sidewalk adjacent to buildings
on the south side of Glenview Road from bridge to Waukegan Road
·
Poured colored and stamped concrete sidewalk
from bridge to Waukegan Road
·
Poured concrete curb & gutter from River
Drive to Church Street within pavement widening area.
·
Poured concrete within Veteran’s Memorial at
River Drive
·
Continue with irrigation piping installation.
·
Continue with underground electrical conduit
installation
·
Set posts and mast arms for new traffic signals
at Church Street and Glenview Road
·
General site clean-up in preparation for Labor
Day weekend.
Work Anticipated to be Performed, September 5th
to September 8th
·
No work planned over weekend or Monday, September
4th in observance of Labor Day
·
Pour stamped and colored concrete at Veteran’s
Memorial at River Drive
·
Pour concrete sidewalk from bridge to Church
Street
·
Remove existing concrete sidewalk from railroad
tracks to Pine Street (Near Glenview House)
·
Install underground conduits and piping near
Glenview House
·
Begin pouring concrete sidewalk on south side of
Glenview Road from railroad tracks to Pine Street (near Glenview House)
·
Continue with underground irrigation piping on
south side of Glenview Road
·
Continue with underground electrical piping on
south side of Glenview Road.
·
Continue installation of traffic signal posts
and mast arms for new traffic signals at Church Street and Glenview Road.
Work is continuing to progress along the south side of
Glenview Road. Next week the contractor will focus work in the area between the
railroad tracks and Pine Street. It is anticipated a majority of work in this
area will be completed prior the Oktoberfest event planned at The Glenview
House in mid-September.
Thanks again for all your patience and understanding as you
live, work, and drive through the construction area.
Have a safe and enjoyable Labor Day Weekend!!!!