Work Performed, July 17th to July 21st  
·         Removed sidewalk on the north side of Glenview Road from Church Street to bridge
·         Poured standard concrete sidewalk on the north side of Glenview Road from Pine Street to Bridge
·         Installed irrigation piping
·         Install electrical conduit and began setting concrete posts for street lighting.

Work Anticipated to be Performed, July 24th to July 28th
·         Pour sidewalk, driveway, and curb & gutter in front of OLPH parking lot (one entrance only)
·         Continue to pour standard concrete sidewalk on the north side of Glenview Road from Church Street to bridge
·         Remove sidewalk, driveways, and curb & gutter as needed on east side of Pine Street
·         Pour sidewalk, driveways, and curb & gutter as needed on east side of Pine Street (one entrance will remain open at all times)
·         Complete storm sewer work
·         Remove and pour half the driveway near Jimmy John’s / Shoppers Row parking lot
·         Continue with irrigation piping installation
·         Continue with electrical conduit installation for street lighting
·         Pour concrete bases for street lights.