Work Performed, July 17th to July 21st
·
Removed sidewalk on the north side of Glenview
Road from Church Street to bridge
·
Poured standard concrete sidewalk on the north
side of Glenview Road from Pine Street to Bridge
·
Installed irrigation piping
·
Install electrical conduit and began setting
concrete posts for street lighting.
Work Anticipated to be Performed, July 24th to
July 28th
·
Pour sidewalk, driveway, and curb & gutter
in front of OLPH parking lot (one entrance only)
·
Continue to pour standard concrete sidewalk on
the north side of Glenview Road from Church Street to bridge
·
Remove sidewalk, driveways, and curb &
gutter as needed on east side of Pine Street
·
Pour sidewalk, driveways, and curb & gutter
as needed on east side of Pine Street (one entrance will remain open at all
times)
·
Complete storm sewer work
·
Remove and pour half the driveway near Jimmy
John’s / Shoppers Row parking lot
·
Continue with irrigation piping installation
·
Continue with electrical conduit installation
for street lighting
·
Pour concrete bases for street lights.
Thank you to all the business owners and patrons while
accessing the businesses along Glenview Road during the construction. The
Village is committed to minimizing any inconvenience to the greatest extent
possible.